Table 5 shows the results of the remedial grouting validation. Visual
inspection during checkhole drilling and sampling for WM dam showed a good core
sample recovery. For AG dam, which exhibited distinct wet zones on the
downstream surfaces, visual inspection after grouting showed the dry state of the
previously wet surface soils. Chemical indicator reaction tests were performed on
checkhole core samples using Phenolphthalein spray. It was observed that the
area penetrated by the grout milk turned red after application of the
Phenolphthalein spray, indicating a good filling of soil voids.
Based on in-situ permeability measurements during the checkhole drilling
process, all dams showed less core layer permeability after remedial grouting. The
maximum permeability coefficient before remediation of approximately 10-4 cm/s
was reduced down to approximately 10-5 cm/s.
The seepage rate measured at the center of the downstream toe after
remediation grouting decreased remarkably for WM and AG dams, indicating
successful permeation remedial grouting.
Electrical resistivity surveys were conducted. Overall, after remediation,
uniformly increasing patterns of resistivity distribution were found as depth
increases.
All of the validation findings support the effectiveness of remedial permeation
grouting for the dams in this study. Remediation grouting of dam cores is
demonstrated using a low-pressure permeation grouting technique that effectively
remediates deteriorated core layers. The empirical case studies in this paper are
believed to offer an important reference for hazard mitigation technology in a wide
range of aging dam rehabilitation projects.
Table 5
Validation of the effect of remediation grouting
Dam WM AG
Visual inspection and
borehole investigation Good checkhole core recovery
condition Previously wet zones on the
downstream surface become dry
Chemical indicator
reaction Confirmed indicator reaction to
grouted core sample using
Phenolphthalein spray Confirmed indicator reaction to
grouted core sample using
Phenolphthalein spray
Permeability (cm/s) Before, k ~ 10-4 max →
After 10-5 max Before, k ~ 10-4 max → After 10-
5 max
Average flow rate
(l/min) or grout
quantity (kg/m) 24 l/min for general holes → 28
l/min for check holes 18.8 l/min for general holes →
14.5 l/min for check holes
Seepage rate (Q)
(m3/day) For reservoir water level =
EL:147 m, Q = 640 m3/day after
1st remediation by compaction
grouting → Q = 4.1 m3/day after
2nd remediation by permeation
grouting Leakage decreased remarkably
after remediation, as measured
by a temporary flowpipe-type
device
1712
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik