a confined response in the lower Karababa Formation, with the intercalated horizon of
bituminous limestone acting as aquitard. In response to the upstream water levels, the
piezometric head became notably artesian. Already in 1990, river water had replaced the karst
water in the deep, confined aquifer. This condition implied recharge from the future reservoir
area close to the dam site. Reservoir filling started end of 1989 and Figure 3 illustrates the
piezometric response in the deep aquifer. Piezometer PH-2M is completed in the upper
Karababa Formation at 120m depth, the other instruments sit below the bituminous layer at
around 200 m depth. Although the tectonic faults cut through this layer, the latter continues to
act as an efficient aquitard, maintaining a head difference of up to 70 m, reaching an artesian
level of about 100 m above the valley floor downstream of the dam. However, the two ellipses
in Figure 3 mark events when the response of the deep piezometers changes synchronously,
evidencing a change in the hydrogeologic regime, most probably due to the opening of a new
drainage path. The observations have the following consequences for the dam: (1) the
magnitude of the uplift pressure raises concerns in respect of the hydraulic stability of the valley
floor downstream of the dam, (2) the performance of the aquitard is not guaranteed, more
important fracturing is conceivable and may raise seepage and concurrent erosion of karst
affected domains. Figure 4 illustrates the importance of the piezometric head downstream of
the dam.
Fig. 4
3D models of groundwater table and piezometric surface downstream of Ataturk grout curtain
Modèles 3D de la nappe phréatique et de la surface piézométrique en aval du voile
d’injection
Monitoring of total reservoir seepage is a difficult undertaking. The powerplant has to be
shut down for sufficient time to approach steady state and this has trans-border implications.
A further complication materialized when the Birecik dam raised the tailwater to the toe of the
Ataturk dam. For these reasons, no measurements were taken after 1998. To obtain the value
corresponding to reservoir seepage, several other components had to be accounted for,
partially poorly defined, and in consequence, a significant error has to be allowed for the data
presented in Figure 5. Nevertheless, the data indicate a favorable effect of the complementary
grouting works performed after the start of reservoir filling and they also imply a fairly stable
performance of the curtain over the period covered by the measurements. Figure 5 also shows
the discharge recorded at the drainage galleries driven at the spillway in the left valley flank
and in the right valley flank behind the powerhouse and farther downstream. The excavation
of these galleries started during the initial stage of reservoir filling in 1990 and was completed
at the beginning of 1993. The measurements in these galleries are not very accurate and this
circumstance may account for the low value reported for 1996.
1745
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik