Figure 2. Different components of Chitgar Lake Project (Diversion Dam (Top Right), Water Conveyance and
Reservoir)
Kan Diversion Dam is a concrete structure built on the seasonal Kan River at a 7km distance to the
Lake in order to increase the level of river water and divert it toward the Lake.
The 7-km Water Conveyance from the Kan River to the Lake is composed of a 3.5km concrete
channel (1.5mx1.1m) and 3.5km of GRP Pipes with varying diameters from 600mm to 1200mm.
The conveyance was designed to have a maximum discharge capacity of 1.2m3/s.
The Lake Reservoir spread over a 132 hectare area with a storage capacity of 6.9 million cubic meter
was the primary component of the project. The Lake has three artificial islands with a total area of
3 hectares within it. By considering the topography of the area and the required depth and geometry
for the Lake, a 10.5 m high and 735 long earth-fill dam plus a perimeter dyke with a total length of
4km were constructed.
2. Necessity of Water tightening for Chitgar Lake
Total allowance for the Lake annual inflow is about 5 million cubic meters while 2.2 million cubic
meter is the estimated annual loss through surface evaporation.
In order to identify the soil layer underneath the Lake and estimate the amount of water seepage,
investigation bore holes were drilled initially on a 400x400 grid and later on refined to 200x200 and
100x100 grids over the Lake's area. Based on the permeability test results at the depth of 2m, the
permeability and seepage potential for the reservoir bed area were listed as given in Table 1.
Following assumptions have been used to determine the permeability parameters provided in the
table:
 Darcy formula (Q=k.i.A) was used for calculation of discharge. (“k” value varies over
different areas)
ď‚· Depth of reservoir was considered between 4m and 10m with an average depth of 7m.
ď‚· Depth of fine-material alluvium layer of reservoir was assumed 4m.
ď‚· Hydraulic gradient was considered 1.75. (i.e. 7/4=1.75)
ď‚· Area of the reservoir is roughly equal to132 hectares
1751
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik