Spaces, cavities or holes should be found before designing of curtain and
an extended program should be realized for a dam site having soluble
sedimentary rocks.
ď‚· Table 4 given in this study can be used as a guideline for designing the
grout curtains in rock units with exception of soluble sedimentary rocks.
ď‚· This study has been realized for only dams having a height of 50 to 100 m.
Further study or studies can be performed for the dams having a height
less than 50 m and more than 100 m.
ACKNOWLEDGEMENTS
Author would like to thank former and actual authorities of General Directorate of
State Hydraulic Works for their sincere supports.
REFERENCES
[1] TOSUN, H. Geotechnics in Dam Engineering- Pervious Soils and
Improvement Techniques. Civil Engineering Chamber 49/2004-2 No.430,
2004, 38-47 (in Turkish)
[2] POWELL,J.J.M and MORGENSTREN, N.R. The Use and Performance of
Seepage Prediction Measures in Seepage and Leakage from Dams and
Impoundments (edited by R.L. Volpe and W.E. Kelly). ASCE, 1985.
[3] FELL, R., MACGREGOR, P. AND STAPLAN, D. and BELL,G. Geotechnical
Engineering of Embankment Dams. Taylor and Francis, ISBN: 978-
0415364409, 2005.
[4] MAGOTO, E.N. and BRYSON, L.S. Evaluation of the Effectiveness of a
Grout Curtain using a Physical Model. Dam Safety 2013, ASDSO 8-12
September 2013, Providence.
[5] ANAGNOSTOPOULOS, C and HADJISPYROU, S. Laboratory Study of an
Epoxy Resin Grouted Sand. Grouted Improvement, 8(1), 2004, 39-45.
[6] BECKHAUS, K., SCHMITZ, S., and SCHWARZ, W. Deep Cut-Off Walls
Constructed Under Dams with Trench Cutters. Long Term Behavior of
Dams. 2008, 305-310.
[7] USBR , Design Standards No. 13: Embankment Dams. Bureau of
Reclamation, 15-28 DS-13(15), 2014,
[8] WEAVER, K. D and BRUCE, D. A. Dam Foundation Grouting. Revised and
Expanded Edition. American Society of Civil Engineers, ASCE Press.
ISBN: 978-0-7844-0764-6, 2007, 504p.
[9] BRUCE, D.A., A. RESSI DI CERVIA and J. AMOS-VENTI. Seepage
Remediation by Positive Cut-Off Walls: A Compendium and Analysis of
North American Case Histories, Canadian Dam Association Conference,
September 30 – October 5, 2006, Québec City, Québec.
[10] ZOU, Y.J. and ZHOU, X.W. Study and application of key technology to
Simultaneous shaft drilling and grouting. Tunnels & Tunneling International
1770
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik