Page - 1799 - in Book of Full Papers - Symposium Hydro Engineering
Image of the Page - 1799 -
Text of the Page - 1799 -
structure. However, the leakage could not be determined with the measuring
device except during the period of localized heavy rain and summer season. It
can be assumed that the water passing through the dam structure did not stay in
the seepage water-collecting wall but flowed to other places.
Various field surveys were executed in order to determine the path of the
water passing through the dam, which found a variety of paths of the seepage
passing through the seepage water-collecting wall and the peripheral ground.
This study intended to describe the survey and analysis processes designed to
determine the cause of performance degradation of the facility for measuring the
seepage in old dams.
2. CURRENT STATUS OF SEEPAGE MEASURING FACILITY
2.1. DAM STATUS
The Upper Dam is CCRD (Center core Rockfill Dam) which is a type of fill
dam; the impervious core zone is installed in the center of the dam structure, the
peripheral area is filled with rocks, and the seepage water-collecting wall is
constructed in the downstream area of the dam structure. (Fig.1, Table 1)
Fig. 1
Sectional Diagram of Upper Dam
1799
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik