Page - 1800 - in Book of Full Papers - Symposium Hydro Engineering
Image of the Page - 1800 -
Text of the Page - 1800 -
Table 1
Specification of Upper Dam
Type - Center Core Rockfill Dam (CCRD)
Dam Crest m EL. 538.0
Length m 290.0
Height m 62.0
Dam Crest Width m 10.0
Dam Volume m3 1,072,600
Inclination of Upstream
Slope - 1:2.3
Inclination of
Downstream Slope - 1:1.7
2.2. CURRENT STATUS OF SEEPAGE MEASURING FACILITY
The seepage measuring facility is composed of a water-collecting wall (Fig.
2) made of a concrete retaining wall (96m in length, 10m in maximum height) and
a measuring room for measuring the collected water in the downstream area of
the dam. (Fig. 3, Fig. 4)
Fig. 2
Water-collecting Wall
1800
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik