Page - 1820 - in Book of Full Papers - Symposium Hydro Engineering
Image of the Page - 1820 -
Text of the Page - 1820 -
DAM FOUNDATION SEEPAGE CONTROL IMPROVEMENT BY
CEMENT-CHEMICAL GROUTING UNDER STORAGE CODITION OF MAE
THI DAM, LUMPHUN, THAILAND
Chatchai PEDUGSORN1, Kanokwan CHUENUAM2, Pearasynp SRISAWAT3,
Supamitr KRISANAMITR4
Head of Design Branch, Regional Irrigation office 11, Geologist of Geotechnical
Branch, Regional Irrigation office 12, Head of Geotechnical Branch, Regional Irrigation
office 13, Head of Dam Safety Management, Regional Irrigation office 14
THAILAND
1. INTRODUCTION
1.1 BACKGROUND
Mea Thi Dam is located in Ban Thi district, Lamphun province in the northern part
of Thailand as shown in Fig. 1. The construction of the dam was completed in 1987, for
purpose to storing water for irrigation and water supply. The constructed dam is 25.60 m
in height , 8 m in width and 437 m in length. The dam is maintained by, the Royal
Irrigation Department (RID). Then in 2009, to increase the dam capacity up to 6.0
million cubic meters from 4.5 million cubic meters, 1 m parapet wall was constructed.
1820
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik