3.2 CHEMICAL GROUTING
For chemical grouting in clay portion high pressure could not be applied during
grouting thus, experiment was carried out to estimate the gel time of water (l), Silicate (l)
and Bicarbonate (kg) mix as shown below in the lab. With reference to lab test, field
mixture with varying gel time was determined and used accordingly.
The ratio of compound mixture from laboratory is as below
Water : Sodium silicate : Sodium Bicarbonate Gel time
173 liters 25 liters 4kg 2-3 hr.
The actual ratio of compound mixture in the field is as below
Water : Sodium silicate : Sodium bicarbonate Gel time
150 liters 10 liters 2 kg 40 min.
115 liters 10 liters 2 kg 20 min.
110 liters 10 liters 2 kg 10 min.
As, due to high uplift pressure on upstream side, chemical grouting was conducted
with application of pressure as given in Fig. 6 at the holes spaced at 6 m distance apart.
Fig. 6 Pressure applied during chemical grouting
4. WORKING PROCEDURE
The works were separated into Zone A, Zone B and Zone Cat connection zone
between abutment and dam body, Gutting Drain and right abutment access road [4]. The
profile of grouting hole depending upon the requirement conditions cement and chemical
grouting were chosen accordingly as shown in Fig. 4. Chemical grouting was carried out
in Zone A and Zone B while cement grouting was carried out in Zone B, C, connection
1825
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik