FOUNDATION TREATMENT CHALLENGES FOR EARTH AND ROCK FILL
DAMS – CASE STUDY OF THE LEFT EMBANKMENT DAM ON ISIMBA (183MW)
HYDRO POWER PROJECT, UGANDA.
Nicholas Agaba Rugaba, Assistant Project Manager, Uganda Electricity
Generation Company Limited (UEGCL)
Co- Authors: Eng. Chad Silas Akita, Project Manager, UEGCL.
Eng. Isaac Arinaitwe, Chief Projects Officer, UEGCL.
Eng.Dr. Harrison Mutikanga, Chief Executive Officer,
UEGCL
Introduction
Uganda will require 8,601MW by 2020, 14,670MW by 2025 and 41,738MW of
electricity by 2040 as it works towards middle income status.1 One of the strategies
in the National Development Plans is to construct large hydropower plants and
thermal power plants through public and private investments, and Isimba Hydro
Power Project is being developed with debt financing to a tune of Five Hundred
Million United States Dollars (USD 500m). The EPC Contractor is China
International Electric and Water Corporation (CWE). The debt financing is provided
by the China Export and Import Banks. For Isimba Hydro Power Project, the
reservoir is retained by concrete structures and two earth-rock fill embankment
dams on both sides of the concrete structures.
1 Uganda’s National Development Plan 2010-2015
1832
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik