zones are compacted in layers 12 to 24 inches (300 mm to 600 mm) thick by heavy
rubber-tired or steel-wheel vibratory rollers. A typical cross-section of an earth
rock-fill embankment dam is illustrated in Figure 2 below.
Figure 2: Typical Embankment Dam Section with Central Clay Core. (Key; 1 -
Impermeable Clay core, 2 Filters/Transition Zones, 3 – Rock fill 4 – Rip Rap or
Concrete face ). Adopted from Robin Fell et al, 2005 (Geotechnical Engineering
for Dams)
Foundation Treatment and Challenges
Geologic processes cause dam foundations to be much less than perfect for the
construction of an embankment dam. Thus, foundation treatment is almost always
required to improve a foundation to a suitable condition before a dam is
constructed. Recognition of natural processes that damage foundations helps to
formulate foundation treatment objectives. Such processes and their effects
include; buried river channels, faulting, shearing, slope instability, solution cavities,
potholes, benches, overhangs, steps, stress relief joints etc.3 At the Isimba Hydro
Power Plant, the right river channel had shear zones in the river bed that needed
concreting and treatment. Foundation treatment is the utilization of ground
improvement techniques so as to mitigate undesirable foundation concerns of
3 Foundation Surface Treatment, Design Standard 13 USBR Manual
1835
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik