foundation treatment to ensure compliance to technical specifications and seepage
control measures.
Seepage through a permeable foundation, similar to the weathered rock foundation
at the Left Embankment Dam at Isimba HPP, can be reduced by constructing a
low permeability cut off through the permeable material. There are various
seepage cut-off approaches namely; cut-off trench filled with earth fill, slurry trench,
concrete diaphragm wall, contiguous or intersecting bored piles, sheet pile wall,
curtain grouting etc. The Left Embankment Dam at Isimba HPP adopted two main
ground improvement methodologies as part of foundation treatment, i.e. grouting
and construction of concrete cut-off wall, along the longitudinal axis of the dam.
Grouting involves the injection under pressure of a liquid or suspension into the
voids of a soil or rock mass or into voids between these materials and an existing
structure. The injected grout must eventually form either a gel or a solid within the
treated voids, or the grouting process must result in the deposition of suspended
solids in these voids. The primary purposes of pressure grouting a soil or rock
mass are to improve the strength and durability of the mass and/or to reduce the
permeability of the mass. Prior to any grouting operation (trial or final), water
pressure testing is done. Water pressure test is performed to measure the rate at
which water can be forced into a hole under a specific pressure. It is from these
water pressure tests, that lungeon values and thus indication of rock mass
permeability are established. For the Left Embankment Dam at Isimba HPP, the
water pressure testing and trial grouting operations indicated high permeability in
the foundation material which was not being significantly reduced by the grouting
during the trial phase. Trial grouting was done in the completely weathered and the
highly weathered rock foundations. The trial grouting indicated high grout takes
and high rock permeability. This thus influenced the decision to adopt utilization of
both the concrete – cut off wall and curtain grouting as the seepage control
measures for the weathered and sound rock foundations respectively.
1837
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik