2. SEAL OF DRAIN “D1”
The initial activities of the project were the execution of grouting drills holes
from the upper grouting gallery to the zone drain D1, at level 135 m a.s.l. obviously
the execution of these grouting holes would damage the operative of the D1 drain,
in case of communication of grouting fluids between both drains.
Due to this, grouting started in drain D1, with the purpose to seal the
filtrations. Although later, it would be necessary to perform new drains to repair the
drains curtain of the dam.
The first interventions failed, because the drain clogged and grouting
mixtures were dragged into the G2 Gallery (located on the outside of the dam body,
as shown in Fig. 1). Since then the D1 filtration moved to upper levels and G2
Gallery maintained a permanent filtration in the order of 20 l/s approximately.
Fig. 1
Panoramic View, left abutment
3. GROUTING MIXTURES
3.1. GENERAL
Most of the grouting of the project was done with mixtures that had a relation
of between w/c 0.70 - 0.50 (see Table 1). Some cases required the use of mortars
(sand/cement). But the grout curtain drill holes which had relation with the source
of karsification or empty karst (erosioned), it was impossible to seal with these
mixtures (each grouting was completed when a volume of grout was reached) and
mixtures were dragged to the outside near the G2 Gallery (see filtration number 1
to 7, in Fig. 2).
1850
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik