Page - 1861 - in Book of Full Papers - Symposium Hydro Engineering
Image of the Page - 1861 -
Text of the Page - 1861 -
A drain was designed at the downstream toe of the dam to collect water draining
from some of the piezometric boreholes.
Some of the instrumentation is in operation since the construction of the
dam, while other monitored points were added later in order to gather more
detailed information at some locations.
The monitoring system comprises of the following:
ď‚· Levelling wells (Fig. 4): measure
the vertical displacement
at the dam foundations level.
The wells are also used for
the measurement of the water
level in the wells providing
information about the drawdown
curve within the dam body.
Fig. 4: View into the levelling well
Fig. 3: Plan of the monitoring points
1861
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik