Page - 1862 - in Book of Full Papers - Symposium Hydro Engineering
Image of the Page - 1862 -
Text of the Page - 1862 -
ď‚· Levelling points (Fig. 5) are used
for measurements of vertical
displacement.
ď‚· Lateral and vertical movement
monitoring points (Fig. 6)
are used for measurements
of the vertical as well as lateral
displacements on the surface
of downstream face of the dam.
ď‚· Piezometric boreholes (Fig. 7)
measure the piezometric
pressure within the dam body.
They are located in five cross-
sections across the dam body.
At some locations, two
piezometric boreholes are
present close to each other,
reaching to different strata.
 Piezometric sensors – are located inside the impervious core of the dam.
Sensors are also located below the tower and below the communication
tunnel. The measurements of the piezometric pressures are carried out four
times per year. Fig. 5: Levelling point
Fig. 6: Lateral and vertical movement
monitoring point
Fig. 7: Piezometric boreholes
1862
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik