Page - 1864 - in Book of Full Papers - Symposium Hydro Engineering
Image of the Page - 1864 -
Text of the Page - 1864 -
The plot also shows that the pressure at sensors located in the dam sealing
(91, 99 and 113) increased steadily for the first 7 years of the dam operation
until they stabilized at values along which they oscillate since 1974. Sensor 99
and 91 stopped providing data at some point.
The reservoir water level curve shows the update of dam operation rules
in 1979. Since then the dam outflow has been optimised and the reservoir
storage has been used closer focus on the hydropower production as well as
on the maintenance of minimum flow in the Ohře River downstream the dam.
In the period of May 1969 – May 1970, one year after the start of dam
operation, the water level was lowered for testing purposes. Fig. 9 shows that
the decrease of about 18 m affected the pressure particularly at the sensor 1
located close to the upstream face of the dam sealing. The other 3 sensors
reacted to the reservoir water level to much lesser extent and with a delay.
Fig. 9
Piezometric pressures at the dam sealing during the dam testing period (May 1969
– May 1970)
1864
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik