Page - 1865 - in Book of Full Papers - Symposium Hydro Engineering
Image of the Page - 1865 -
Text of the Page - 1865 -
4.2. SETTLEMENT OF THE DAM
The settlement of the dam body has been continuous since the dam
construction without any anomalies (Fig. 10). The highest settlement of the dam
crest is located near the communication tunnel. At this point the settlement has
steadily grown to the value of 550 mm in 2016.
The settlement of the dam surface is related to the settlement
of the foundation level [3].
The dam settlement was accounted for in the dam design. The dam crest
was designed 0,5 m higher than its expected level after the settlement.
Fig. 11 shows the vertical movement of the communication tunnel. It shows
that there has been no significant vertical movement since 1982.
Fig. 10
Vertical movement of the dam crest
1865
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik