Page - 1871 - in Book of Full Papers - Symposium Hydro Engineering
Image of the Page - 1871 -
Text of the Page - 1871 -
The project consists of CFSGD, a 14 km long power tunnel, diversion works,
a main and an environmental powerhouse as well as a gated spillway. A general
layout is shown in Fig. 1. More details concerning the general layout of the project
and details had been already published before [1] [2] [3].
Fig. 1
General layout of the project
2. GENERAL DAM AND FOUNDATION DESIGN
2.1. GENERAL DAM DESIGN
The Arkun dam is of CFSGD type including a rockfill part at the downstream
slope. The dam design was prepared according to the corresponding ICOLD
bulletin for CFRDs [4] and modern dam design criteria [5]. The design of the main
dam was adapted to the special requirements imposed by using not free draining
sand-gravel fill at the main dam embankment fill zones as discussed in [9] (see
Fig. 2).
A parapet wall was placed at the crest. The upstream surface is covered by
a concrete slab sealing which is connected via an articulated plinth to a cut-off wall
(COW) which is reaching down to the bedrock which is located underneath a 70 m
deep alluvial layer. The slopes are inclined by H:V = 1.0 : 1.6.
The spillway is designed for a PMF flood with a discharge of 4,701 mÂł/s. A
gated spillway was placed at the right abutment integrating three bays close to the
intake of the power tunnel. The power tunnel to the main powerhouse is
1871
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik