approximately 14 km long with a diameter of 6.5 m. The tunnel shows a high
pressure grouting pre-stressed concrete lining.
Fig. 2
Typical cross section of the Arkun CFSGD
The diversion tunnel is located on the left side of the dam. The diversion
tunnel hosts the pressure tunnel to the environmental powerhouse. The penstock
for the environmental powerhouse was constructed after the diversion tunnel was
closed and plugged (Fig. 1) when the impoundment of the reservoir started.
2.2. SEALING AND SEEPAGE DESIGN
The Arkun Dam sealing and seepage design consists of an upstream barrier
comprising a surface concrete slab sealing, an articulated plinth, and a cut-off wall.
An L-shaped drain and a free draining rockfill zone (3G) shall guarantee a high
safety level regarding the control of the seepage, also in consideration of critical
failure of the upstream sealing barrier.
The drain (zone 3H) itself is protected by a suffusion filter (zone 3H*) in order
to hinder small particles which are activated by suffusion processes within zone
3A. The sand-gravel material used for zone 3E was considered to be suffusive.
The zoning concept of the dam is shown in Fig. 2.
2.3. FOUNDATION DESIGN
The dam body is placed on a 70 m deep alluvium layer. A stress-strain
deformation analysis was performed in order to evaluate the deformation at critical
1872
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik