Page - 1882 - in Book of Full Papers - Symposium Hydro Engineering
Image of the Page - 1882 -
Text of the Page - 1882 -
FOUNDATION TREATMENT WITH CUT OFF WALL IN TUGU DAM1)
Ni Made SUMIARSIH
Indonesian Dam Centre, Indonesian Ministry of Public Works and Housing
Airlangga MARDJONO
Indonesian Dam Centre, Indonesian Ministry of Public Works and Housing
Nisa Andan RESTUTI
Indonesian Dam Safety Unit, Indonesian Ministry of Public Works and Housing
Ali CAHYADI
Indonesian Dam Centre, Indonesian Ministry of Public Works and Housing
INDONESIA
ABSTRACT
Tugu Dam is an earth fill dam located in Trenggalek district who has a
problem with its foundation which is consists of a relatively thick deposit of pervious
alluvium. When the dam foundation consists of a relatively thick deposit of pervious
alluvium, the designer must decide whether to make a complete cut off wall
(diaphragm wall) or allow a certain amount of under seepage to occur under
controlled conditions.
To improve the earth fill dam with pervious foundation by cut off wall can be
divided into three types: conventional concrete, slurry trench, and plastic concrete
wall. Based on the many reasons, Tugu Dam could be proposed using Plastic
Concrete Wall as a cut off wall.
Screen grouting under the cut off wall is considered to make sure the water
seepage could be protected.
COMMISSION INTERNATIONALE
DES GRANDS BARRAGES
-------
VINGT-SIXIÈME CONGRÈS DES
GRANDS BARRAGES
Autriche, juillet 2018
-------
1882
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik