5. SEALING THE FOUNDATION
5.1. FOUNDATION GROUTING
The physical characteristics of the natural rock mass are notably insufficient
both in regard of the rock mechanical properties of the foundation, as well as with
respect to the permeability or water tightness of the sub-surface. Therefore, rock
mass treatment with consolidation grouting and curtain grouting was considered
necessary, in the early stage already. Contact grouting was performed not only in
the lower parts of the dam foundation, but also on the steep abutment slopes to
provide a proper bond of the dam concrete to the rock.
The consolidation grouting was generally implemented for the entire dam
footprint with extending to the areas 5 m upstream and 10 m downstream beyond
the footprint. The holes were drilled vertical in river channel area and inclined on
the abutments with a spacing of 3.0 x 3.0 m. High pressure was applied in the
consolidation grouting to improve the grouting effectiveness. The purposes were
among others (i) to improve the mechanical properties of foundation rock; (ii) to
enhance the integrity and reduce deformation and differential settlement of rock
mass; and (iii) to strengthen the existing stress-relief rock mass and fill the fissures,
cracks and voids/cavities so as to reduce the permeability and seepage of rock
mass. After the consolidation grouting of the rock mass, the permeability shall not
exceed 5 LU, and the sonic velocity shall be at least 4160 m/s in shallow part and
4250 m/s in deep part, respectively. The deformation modulus shall not be less
than 6 GPa for the river channel area, 5 GPa for the lower parts of the abutments
and 3 GPa for the upper part.
In the river channel area, the consolidation grouting followed placement of
1 m thick concrete as surcharge. The grout holes were 76 mm diameter in a depth
of 20 to 25 m into rock. The method of descending stage grouting with 5 m each
was employed. The pressure was limited to 0.8 MPa for the top 5 m at beginning,
while it was gradually increased with the depth to 2.5 MPa. The heave monitoring
was conducted during grouting of the first stage holes, and soon found that the
0.8 MPa pressure for the top 5 m was too high, causing heave and cracking of the
surcharge concrete. Then, the grouting for the top 5 m was divided into two stages
of 2 m and 3 m. The pressure was adjusted to 0.2 MPa for the upper 2 m stage
and 0.5 MPa for the lower 3 m stage. Additional consolidation grouting was carried
out as the surcharge concrete raised to 4.0 m thickness, by which the grouting
criteria above were satisfied.
The consolidation grouting for the abutments and placement of RCC dam
was alternately carried out. For an RCC lift of 3 m (10 layers), grout holes were
firstly drilled into the abutment rock. The grouting was conducted for the stages
below the top 5 m and the pressure was gradually increased with the depth to
3.0 MPa. For the top 5 m stage, a PVC pipe was installed at hole entrance and
1897
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik