[4] LIU Z. Treatments of cracks in surcharge concrete of consolidation grouting
for foundation rock of Gomal Zam RCC dam (in Chinese). Technology
Outlook, 2016, No.10, pp.38
[5] ZHANG Z. & LUO F. Causes of „Hanging River” at Gomal Zam Dam Project
(in Chinese). Journal of Tianjin City Construction College, No. 4, 2004
[6] SINOHYDRO CORPORATION. Technical Measure for Treatment of GZDP
Reservoir Seepage. Unpublished report WAPDA/F.W.C., 2011, pp. 8
SUMMARY
Gomal Zam Dam, a multipurpose project in Pakistan, planned for irrigation
and drinking water storage, flood control and power generation is an RCC arch-
gravity structure of 133 m height, 231 m length, and 10 m top width. The dam
foundation consists exclusively of limestone with minor intercalation of various
marls. Due to repeated internal folding, the strata underwent distinct to heavy
tectonization causing loosening of the rock mass and very high permeability. Major
faults in the right abutment striking sub-parallel to the river, as well as the loosening
of the highly tectonized limestone belong to the main engineering geological
features jeopardizing the dam stability. Furthermore, the high permeability of rock
mass with Lugeon values between 8 LU to 90 LU is causing considerable seepage
problems through the foundation.
Treatment of the faults in the right abutment comprise the implementation of
concrete shear keys with concrete filled shafts and tunnels at several levels. In
order to improve and strengthen the jointed rock foundation, deep-extended
consolidation grouting with high pressure was carried out over the entire footprint
area. To seal the foundation and to prevent considerable seepage beneath the
dam, a clay blanket was placed between the upstream face of the main dam
towards the clay core of the upstream rock fill cofferdam. Last but not least a deep
grout curtain starting from grouting galleries and adits was implemented.
Initial reservoir impounding started in March 2011. Shortly after
commencement of impounding significant seepage into the lowest grouting gallery,
as well as some 2 km downstream of the dam occurred. Mitigation measures
regarding seepage into galleries included immediate grouting of existing drainage
holes, reactivation of the drainage system in order not to jeopardize the stability of
the dam and lateral extension of the deep grout curtain.
The Gomal Zam RCC arch-gravity dam was completed in 2012. Problems
regarding the dam stability appear to be solved. Seepage downstream of the dam
in the order of 5% to 7.5% of the natural discharge could not be reduced
considerably.
1904
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik