These other BGM installations were done at the satisfaction of international
consultants (Golder Associates Lima, Vancouver and Yellowknife (NWT, Canada))
and the clients public client, Canadian Government, or private mine companies:
Milpo in Peru, Rio Tinto in UK, Agnico-Eagle and Kinross from Canada on time and
without any delay due to bad weather or strong winds either in altitude (4800m) or
in very cold region, even inside polar circle.
At last, we would highlight that despite the large earthquake at the Cerro
Lindo mine, the BGM maintained its core function of waterproofing and there were
no defects of seepage because of this. The BGM has maintained the reservoir in
the dam at full capacity for the past ten years and there has been no loss of activity
at the mine due to seepage.
Furthermore, The City of Los Angeles Department of Water and Power
(LADWP) was building two large concrete water reservoirs in Universal City, Los
Angeles, California. Each reservoir is designed to hold over 210.000 m3 of fresh
water.
LADWP determined that the on-site soils beneath the east reservoir were
only medium dense and could if saturated be subject to liquefaction during a strong
earthquake and could settle a few inches. An order of magnitude that could lead
to structural damage to the concrete reservoir and affect its integrity to remediate
the liquefaction potential, LADWP engaged a remediation and mitigation program
full seismic phenomenon.
The Precision lab (Anaheim, California, USA) conclusions/ BGM is not
affected by the seismic induced shearing and will not be overstressed during a
seismic event as the interface friction angle between the soils and the interfaces
are in the same value of magnitude, the risk of slippage of the confined BGM is
very low.
Installation is much less dependent on weather conditions. Due to the
extended construction season of BGM, the completion of the geomembrane
portion can be done in half the time of a HDPE solution. The reduced construction
period means that the equipment used for the reservoir can be used earlier in mine
construction. For investors, this could have the mine operation up and running
much sooner, and the financial impact could be huge in mine activity.
5. REFERENCES
GIRARD, H., FISCHER, S., ALONSO, E., 1990, Problems of friction posed using
geomembranes on dam slopes – Examples and measurements, Geotextiles and
Geomembranes, 9, p. 129-143, England, Elsevier.
1917
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik