3. RECORDED PORE PRESSURES IN DAM FOUNDATION
As mentioned in part 2 of this paper and depicted in Fig. 4, two pairs of pore
pressure measuring gauges are implemented in each cross section of the dam
body to study the pore water pressure generations and dissipations through the
dam foundation. In Fig. 6, the variation of the measured pore water versus time is
depicted for the three studied cross sections of the dam along with the variation of
the dam reservoir water elevation and dam body filling level. As illustrated in Fig.
6, in general, pore water pressure in each gauge has been increased by increasing
the dam body elevation (during construction) and due to first impounding and then
slightly approaches to the constant value. In addition, the recorded pore water
pressures at downstream sides of the cross sections are greater than those for the
upstream sides, which implies the suitable function of the cutoff wall system.
4. ANALYSIS ON THE CUTOFF WALL PERFORMANCE
To assess the workability of the cutoff wall, recorded pore water pressures
at upstream and downstream sides in dam foundation are considered. In this
regard, a performance index, k, has been defined as presented in Eq.[1]:
k = (Uup – Udown) / (Wr – Zi) [1]
In which, Uup and Udown are the recorded pore water pressures by two semi-
elevated pore pressure gauges placed at the upstream and downstream sides of
the cutoff wall, respectively, and Wr and Zi are the reservoir water and pore
pressure gauges elevations, respectively [10, 12].
From Eq.[1], one can postulate that the more value the k gained, the more
water head lost occurred due to the better performance of the cutoff wall to
elongate the seeping stream lines.
Diagrams of the changes in k v.s time in three studied sections 2-2, 5-5 and
7-7 of the Silveh dam for 2 pairs of pore pressure gauges at each cross section
are shown in Fig.7. Data presented in Fig. 7 shows that during dam body
construction, k values show oscillations by time increasing which can be related to
the simultaneous pore pressure generation and dissipation in dam foundation. The
same pattern can be observed during first days of reservoir impounding. Anyhow,
after reaching the dam body to its proposed maximum height and stopping the
reservoir further impounding, k approaches to an almost constant value, which
show the steady and controlled seepage through the dam foundation. Moreover,
positive k values in all time ranges shows the pore pressure at upstream sides of
the cutoff wall is always greater than the corresponding value at the downstream
side (regarding Eq.1) and implies the suitable sealing performance of the cutoff
wall.
1924
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik