Page - 1928 - in Book of Full Papers - Symposium Hydro Engineering
Image of the Page - 1928 -
Text of the Page - 1928 -
[4] JAFARZADEH, F., YOOSEFI, S., BANIKHEIR, M., GHASEMZADEH, H.,
GARAKANI, A. A., Leakage Evaluation from Foundation of Old Embankment
Dam by Instrumentation Data Analysis and Geoelectric Field Tests: A Case
Study on Mahabad Dam, International Symposium on Dams in a Global
Environment Challenges, Bali, Indonesia, 2014.
[5] EVANS, J.C., Vertical cutoff walls. In: Daniel D.E. (eds) Geotechnical
Practice for Waste Disposal. Springer, Boston, MA, 1993
[6] YAN, L., TRAPP, D.A., SY, A., Construction of Plastic Concrete Seepage
Cutoff Wall for the New Coquitlam Dam, Sixth International Conference on
Case Histories in Geotechnical Engineering, 2008.
[7] Roghani, A., Evaluation of Strength Parameters of Plastic Concrete by
Triaxial Tests, M.Sc. Thesis, Civil Eng. Dept., Sharif University of
Technology, 2011.
[8] GARAKANI, A. A., SHAHRABI M.M., JAFARZADEH F., ESKANDARI N.,
BANIKHEIR M. Determination of critical water level during first impounding
in earth dams using unsaturated transient seepage analyses. 19th
International Conference on Soil Mechanics and Geotechnical Engineering
(19th ICSMGE), Seoul, Korea, 2017.
[9] ABGEER CONSULTING ENGINEERS CO. Plan view reports of the Silveh
dam, 2007.
[10] ABGEER CONSULTING ENGINEERS CO. Behavioral report of the Silveh
dam after construction, 2015.
[11] ABGEER CONSULTING ENGINEERS CO. Complementary design studies
on body and foundation of the Silveh dam, 2012.
[12] JAFARZADEH, F., GARAKANI, A. A. Foundation Treatment in Rockfill Dams
with Consolidation Grouting. Seventh International Conference on Case
Histories in Geotechnical Engineering and Symposium in Honor of Clyde
Baker. Chicago, USA, 2013.
SUMMARY
In this paper, the sealing function of the executed cutoff wall water barrier
system of an embankment dam in IRAN, namely Silveh dam, has been assessed
by implementing instrument pore pressure data. For this purpose, at three different
cross sections of the dam body and its foundation, recorded pore pressures at both
upstream and downstream sides of the cutoff wall have been used to calculate a
performance index, k.
The performance function is defined as the ratio of the pore pressure
difference at upstream and downstream sides of the cutoff wall to the maximum
possible hydrostatic pore pressure at the level of measuring. It actually gains larger
values when the pore pressure difference at two sides of the cutoff wall increases,
which means the cutoff wall, is working properly.
1928
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik