2.3. BACKGROUND ON COMPOSITE DAMS
Incidentally most of the early dams, prior to the advent of concrete in early
1900s, were all of composite construction. It is now recognized that the masonry
remains of the oldest dams known, the 5000 year old Jawa Dams in Jordan were
the spillways. The oldest known continuously operating dam in the world is in South
India, built 1800 years ago. It had a main stone masonry structure with earthen
embankments on its flanks as its name in the local Tamil language Kallanai also
implies. This dam was apparently rehabilitated in 1776 following a major flood by
the then English rulers. Strangely one of the earthen spillways ever designed was
for the ancient Maduru Oya dam in Sri Lanka. It was placed several kilometres
from the main dam on a naturally occurring saddle. The dam was built in the 12th
century, but may have never been completed although intact headworks were
excavated downstream of the new dam and now saved for posterity.
Of the four RCC dams in Jordan that were built some twenty years ago and
have been in operation, two at Wala and Mujib respectively are composite dams.
Engineers could obtain additional information from available publications on RCC
dam construction in Jordan. Grouting at Mujib dam has also been extensively
addressed in several publications and in a text.
Other notable composite dams include the recently completed Neelum
Jhelum diversion dam at Nauseri in Pakistan that has recently begun filling up for
operation. The main boundary thrust fault crosses this composite dam. Some
details of this dam briefly described in a publication by Engineer Khaliq Khan
(2012) and other relevant information are available on the internet. After taking into
consideration the Chi Chi earthquake damage to the Shih-Kang Dam in 1999, a
composite dam was proposed and eventually provided at Nauseri instead of the
concrete dam with a Clyde dam type slip joint that was provided in the tender
design.
2.4. COMPOSITE DAMS OVER FAULTS AND FAULT ZONES
Fault movements in the footprint of a dam are the most critical seismic hazard
for most dam types. If no other site can be selected, then a conservatively designed
earth core rockfill dam would be the only solution (Wieland 2012).
Robert C. Lo and Yumei Wang (2012) in their Lessons Learned from Recent
Earthquakes - Fault Displacement note Fault displacement caused significant
structure damages in the Wenchuan earthquake. Fault displacements reported in
the literature range from few metres to tens of metres.
The following is a relevant summary for composite dams from the Lessons
Learned from Dam Incidents and Failures as reported by Richards:
ď‚· Seepage along penetrations through embankment parts of composite
dams should be controlled using a filter diaphragm instead of anti-seep
1935
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik