Page - 1957 - in Book of Full Papers - Symposium Hydro Engineering
Image of the Page - 1957 -
Text of the Page - 1957 -
a) The necessity of drilling cross boreholes, b) more appropriate contact
with effective major joints and c) more success in sealing the rock mass
of foundation.
Fig. 1
General Plan of Glevard CFRD Dam
The existing effective joint and fissures crack system in the limestone, mainly
with 60 to 90 degrees angle with two dominant directions, using an inclined curtain
with drilling inclined borehole, will result in successful sealing of the water-
tightening curtain. The inclined grout boreholes should drill in two opposing
directions and inside the grout curtain plane with an appropriate angle and direction
regarding joint sets at the left abutment with 140/20 and 50/20.
The existing effective joint and fissures crack system in the limestone, mainly
with 60 to 90 degrees angle with two dominant directions, using an inclined curtain
with drilling inclined borehole, will result in successful sealing of the water-
tightening curtain. The inclined grout boreholes should drill in two opposing
directions and inside the grout curtain plane with an appropriate angle and direction
regarding joint sets at the left abutment with 140/20 and 50/20.
1957
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik