SUMMARY
Over the life span of around 60 years the mass concrete of the Cathaleen’s
Fall gravity dam has begun to leak at some of the horizontal construction joints.
These joints were sealed with low pressure grouting of microfine cement and
synthetic resin. The entire work was finally completed in autumn 2014. The
following graphs (Figure 12 and Figure 13) show how the grouting has successfully
reduced the seepages in the dam. The vertical axis shows the seepage (ltr/s) and
the horizontal axis the date (years).
Figure 12: Plot of Seepage ‘U Leak’ on Downstream Face of Block U
(showing results of sealing works)
Figure 13: Plot of Seepage ‘MTD’ within Inspection Gallery from Blocks S & T
(showing results of sealing works)
0 .0 0
0 .2 5
0 .5 0
0 .7 5
1 .0 0
1 .2 5
1 .5 0
0 .0 0
0 .2 5
0 .5 0
0 .7 5
1 .0 0
1 .2 5
1 .5 0
1 9 9 0 2 0 0 0 2 0 1 0
U p p e r A l e r t = 0 .0 5 0 ( l /s )
L o w e r A l e r t = 0 .0 0 0 ( l /s ) D a m M o n it o r - P lo t o f C a t h a le e n s F a lls S p r in g D a t a .
D a te
E D -U L E A K
0 .0
0 .5
1 .0
1 .5
2 .0
2 .5
3 .0
3 .5
0 .0
0 .5
1 .0
1 .5
2 .0
2 .5
3 .0
3 .5
1 9 9 0 2 0 0 0 2 0 1 0
U p p e r A l e r t = 0 .8 5 0 ( l /s )
L o w e r A l e r t = 0 .0 0 0 ( l /s ) D a m M o n it o r - P lo t o f C a t h a le e n s F a lls S p r in g D a t a .
D a te
D G -M T D
Sealing Works 2014
Sealing Works 2014
2003
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik