Size of bell mouth entrance : 5.0 m x 9.5 m
Length of transition : 6.6. M
Size of gooseneck tunnel : 6.0 m dia.
Elevation of tunnel at entrance : El. 287.0 m
(III) SERVICE GATE DETAILS
Size of Gate : 9.5m x 4.57m
Number of Gates : 2 Nos
Head on gate at FRL : 67.5m
Depletion tunnel comprises elliptical entrance, transition from rectangular to
circular section,25m radius vertical bend straight circular section of 6.0m dia.
followed by transition to join diversion tunnel.. Energy dissipater for the
diversion-cum-depletion tunnel was required to perform for maximum observed
flood discharge of 1500 Cumecs in diversion stage and 568 Cumecs under head
of 37.0m for depletion stage. Diversion stage was to exist for 3-4 years where as
depletion stage is a permanent feature. Keeping in mind site constraints and
already constructed end portion of the tunnel, number of alternatives were
suggested by NEEPCO, CWC and CWPRS. .Based on model studies and
discussions deflector type energy dissipater without splitter blocks was finalized
5.0 THE MODEL
A 1/ 40 scale geometrically similar model of diversion tunnel including
bell mouth entrance, circular tunnel, gate well, transitions was reproduced in
smooth, transparent acrylic sheets. A high level steel-cum-masonry chamber was
constructed to represent the portion of reservoir. Hill contours in the vicinity of
entrance to diversion tunnel and depletion (gooseneck) tunnel was reproduced in
masonry. A part length of river portion along with hill contours at tunnel exit was
reproduced in masonry. For GS model of scale 1/40 various hydraulic parameters
for the model are
shown in Table i
Table.1 Hydraulic Model Scale for Diversion-cum Depletion Tunnel
Scale
type Length
scale Flow
velocity
scale Flow
quantity
scale Force
Scale Roughness
coefficient
scale Time
scale
Actual
scale 40 6.325 10120 64000 1.849 6.325
Discharge flowing through the tunnel was measured on a sharp crested Rehbock
Weir with an aerated lower nappe. Hydraulic pressures inside the tunnel were
observed with piezometric tubes by connecting them to a water manometer.
Propeller type current meter was used for measuring velocity of flow.
Hydrodynamic forces on service gates were measured with Load Cell fixed on
service gate and gate operating mechanism.Load cell readings recorded for gate
opening ranging fro 0 % to 30 % with gate opening interval of 10%.
2023
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik