Page - 2028 - in Book of Full Papers - Symposium Hydro Engineering
Image of the Page - 2028 -
Text of the Page - 2028 -
deflector tip before commencement of ski action for small tunnel overflows,
suitable protective measures in the form of concrete apron or dumping boulders
along full width of deflector was suggested.
For proper aeration of the jet issuing from the deflector a recess of about
5 m on either side of the deflector may be provided .It may effected by cutting
the left riverbank and then joining the deflector through suitable curve.
RECOMMENDATIONS:
1. In order to reduce the heavy negative pressures on gooseneck tunnel,
its profile is modified to parabolic shape
2. A suitable obstruction in diversion tunnel to reduce area to 25% to
prevent negative pressures in gooseneck area .
3. According to model study maximum down-pull force of 180 tonnes
and uplift of 36 tonnes is recommended for design of hoist capacity.
4. The transition from 12 m circular to 12 m rectangular in a length of 12
m to be provided between the exit of tunnel and beginning of the
deflector (Fig. 5)
5. The deflector type energy dissipater with radius of 70.18 m exit angle
of 13.5 degree without splitter blocks recommended for installation.
6. Suitable bank protection measures may be adopted considering
maximum velocity along right bank to be without splitter blocks
6.9m/s and 5.6m/s with splitter blocks in energy dissipator .
7. For better aeration of the jet, recess on either sides of the deflector
may be provided.
8. Bank protection works may be provided accordingly and toe of the
deflector may be founded and keyed to hard rock.
REFERENCES:
[1] BIS 4880 (Part III, Hydraulic design)-2000, Code of practice for design of
tunnels conveying water.
[2] Bureau of Reclamation (BUREC) 1987, Design of Small Dams, 3rd
edition, Bureau of Reclamation, Water Resources Technical Publication,
Denver
[3] Chavan Balkrishna Shankar (2017), Unified Equation for Estimation of
Friction Factor, Proceedings of 37th IAHR World Congress, Aug13-18,
held at Kuala Lumpur, Malaysia Pages 5885-5893.
[4] EM 1110-2-2901, A Tunnels and Shafts in Rock Bureau of Reclamation,
Water Resources Technical Publication, Denver
[5] ICOLD. 1986. River Control during Dam Construction, bulletin 48a, Paris.
Manzanares, A.A. 1980.
[6] CWPRS Technical Report Number 3405,1997, Hydraulic Model Studies
for Emergency and Service Gates of Depletion Tunnel, Doyang HE
Project.
[7] CWPRS Technical Report Number 3402,1997, Hydraulic Model Studies
for Energy Dissipation Arrangement at the exit of Diversion-cum-depletion
Tunnel, Doyang HE Project
2028
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik