2.2. HAZARD ON WATER DELIVERY BUILDINGS
In the late 1960s, limnoperna fortunei invaded Hong Kong, resulting in a
pollution density of 11,000 limnoperna fortunei per square meter in the pipelines
and pumping stations, and they formed a permanent breeding population since
then [6]. The breeding of a large number of limnoperna fortunei not only reduces
the orifice area of the water delivery pipelines [7], but also increases the pipe wall
roughness. The intercepted limnoperna fortunei before the grille will not only
reduce the discharge capacity of the grille, but also plug or block the pump station
pipelines and power station cooling water pipelines. The limnoperna fortunei
consumes the dissolved oxygen in the water during its respiration and excretes the
ammonia nitrogen and nutrients during the metabolism [8], which will result in that
the shell attached to the wall is rotten to produce bad smell and deteriorate the
water quality so as to indirectly cause the corrosion of water machinery system. In
addition, globally, there have also been examples of the destruction of ecosystems
caused by the migration and multiplication of limnoperna fortunei, resulting in its
infringement into the local water delivery pipelines and water conservancy facilities
as well as the ecological structure of local water bodies [9].
3. RESEARCH SITUATION OF PREVENTION & CONTROL MEASURES OF
LIMNOPERNA FORTUNEI
At present, the prevention & control study of limnoperna fortunei is generally
aimed at the water delivery pipeline of conventional waterworks, and the study
simply on the large cross-section and large flow of hydroelectric power plants has
not been carried out yet. In general, the prevention & control measures generally
include the following aspects:Biological prevention & control, Surface painting,
Manual and mechanical removal and Chemical prevention & control.
4. STUDY ON TREATMENT OF GUANGZHOU PUMPED STORAGE
POWER STATION
4.1. GENERATION OF LIMNOPERNA FORTUNEI
Guangzhou Pumped Storage Power Station (hereinafter referred to as “
Guangzhou PSPS”) is divided into A/B plants and it is built by two phases and it
is put into production in 2000.Guangzhou PSPS found a large amount of
limnoperna fortunei when it drained the downstream waterway of Plant B on
October 11, 2012. The downstream waterway of Plant B was drained up in October
2033
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik