updated by applying the future scenarios of the deterioration of the cavern
supports to its present structural condition [1], [2], [3].
Following updated management criteria at the above-mentioned
underground powerhouse, seven-year convergence data at two generator
sections has been accumulated so far. While one is stable, however another
section has been shortened gradually, but does not touch the maintenance
criteria. In this paper, the convergence behaviors are examined from the
standpoint of the structural response of the cavern.
2. OUTLINE OF AN UNDERGROUND POWERHOUSE STUDIED
The underground powerhouse studied in this paper, is located in the central
part of Japan, includes output of 220 MW, two generator units and discharge of
266 m3/s, with completion in 1968. It has the dimension of 23 m wide, 42.25 m
high and 70.2 m long. Due to the existence of the reservoir above 100 m of its
location, the underground powerhouse was constructed with grouting as the
watertight structure. The surrounding weak geological zone caused excessive
displacement of the cavern and imposed the additional structures to strengthen
the stability of the cavern, such as additional arch structures and thicker side wall
and slab during the construction. Its characteristics are shown in Fig. 1.
A few damaged PS anchors were identified in 2008, which was 40 years
after the completion of the cavern, while no other deterioration in the cavern was
found. These are shown in Fig.2. PS anchors arranged in the cavern are a type
of un-bond with applying the bituminous coating around the tendon and mortal
grouting in the boreholes. It is considered that a few damaged supports did not
affect the stability of the cavern. However additional monitoring, which involves
measuring the tension stress of existing anchors and monitoring the cavern
convergence and major structural beams, was planned to clarify its long-term
performance.
The monitored convergence performed in seven years is only examined in
this paper from the mechanical view point of the cavern behavior.
3. CONVERGENCE OF THE CAVERN
Monitoring plan is shown in Fig. 3. The convergence is monitored at the
middle elevation of two generator sections of No. 1 and No. 2 in the machine
room using a new device using the diffused laser beam, referred to as the
diffused laser range finder (DLRF) [1], which consisting the laser transmitting and
receiving unit and the reflecting board. The distance between the unit and the
board is continuously measured in a precision of 0.1 mm with any interval. The
overview of DLRF is shown in Fig. 4. The circumstance conditions of the
2045
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik