According to observations in the Besai tunnel, the steel reinforcement does
not fully guarantee an even distribution and equal opening of the radial cracks in
the concrete liner. The most severe cracking concentrated in the crown, and in
these cracks the steel had been strained beyond yield strength. In consequence,
the elastic action assisting the balancing of internal and external head was
impaired. Perhaps consolidation grouting to notably higher pressures than
suggested by EPRI [16] would be helpful in this context.
This case history emphasizes the importance of hydrogeological studies.
Such studies are indispensable to assure the geohydraulic steady state assumed
for the design methods according to [8 to 12]. Where the geological setting
indicates potential for hydrogeological complexities, specific investigations may
become necessary, in addition to the geotechnical exploration, and these
investigations may have to cover an ample margin beyond the perimeter of the
tunnel. Even with such thorough additional studies, it is prudent to monitor the
hydrogeological response during construction and filling. Such monitoring will have
to be of high quality, e.g. with pore pressure cells and/or multi-port piezometers.
9. ACKNOWLEDGEMENTS
The authors gratefully acknowledge the backing by the owner of the project
– Perusahan Listrik Negara – who supported the investigation and analysis of the
incident and granted use of the data and information discussed in this text.
REFERENCES
[1] Dann, H. E., Hartwig, W. P., Hunter, J. R., 1964: Unlined tunnels of the
Snowy Mountains hydro-electric authority, Australia. ASCE 90, PO3, pp 47ff
[2] Deere, D. U., 1983: Unique geotechnical problems at some hydroelectric
projects. Proc. 7th Pan Am. Conf. Soil Mech. Found. Eng., pp 865-888
[3] Buen, B., Palmstrøm, A., 1985: Design and supervision of unlined hydro
power shafts and tunnels with head up to 590 meters. Norwegian Soil and
Rock Engineering Association, Publication No. 3, pp. 65-73
[4] Palmström, A., Broch, E. (2017). The design of unlined hydropower tunnels
and shafts: 100 years of Norwegian experience. Hydropower and Dams, 24,
3, pp 72-79.
[5] Frey-Baer, O., 1944: Berechnung der Betonauskleidung von Druckstollen.
Schweiz. Bauzeitg., 124, 14-15
[6] Lauffer, H., Seeber, G., 1961: Design and control of linings of pressure
tunnels and shafts, based on measurements of the deformability of the rock.
Proc. 7th Congr. ICOLD, Q 26-R91, pp 679-709
[7] Seeber, G., 1999: Druckstollen und Druckschächte. Enke
2078
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik