Cast concrete inner linings with reinforcement (to distribute cracking) were
used at the transitions between the rectangular cross section of the gate chamber
and the adjoining circular tunnel, as well as at branches. In the tailrace tunnel,
further reinforced concrete inner linings were used near the caverns and the outlet
structure. In areas where the stresses from internal pressure could indeed be
resisted by the rock mass but water losses were possible due to the low
groundwater table in relation to the internal pressure, a thin-walled steel lining was
used. The thin steel lining is not designed to withstand buckling due to external
pressure, therefore it requires a support ring, which was designed to resist the
groundwater pressure of up to 39bar in this area. The dimensioning of the thick-
walled steel lining was performed in accordance with the work of Seeber [9],
including considerations of the collaborative action of the rock mass. Thick-walled
steel lining was used in zones where the collaborative action of the rock mass was
not able to resist loading from internal pressure alone. Thick-walled steel lining was
also used in zones near large cavities with atmospheric pressure conditions, such
as the powerhouse or gate chamber. The thick-walled steel lining was designed to
resist not only internal pressure but also external water pressure. This design was
done in in accordance with the calculation models of Amstutz [10]. The transition
from the unreinforced cast concrete inner lining of the Silvretta tunnel to the thin-
walled steel lining was placed at the intersection of the characteristic dynamic
internal pressure curve with the design value of the groundwater table. The
transition from thin-walled to thick-walled steel lining was placed at the intersection
of the design internal pressure curve with the smallest normal stress in the cross
section (estimated from the FE analyses). This procedure includes the
consideration of the geological and topographical conditions. The dimensioning of
the thick-walled steel lining was based on steel grade S 690. The material
parameters for the steel and the rock mass are given in Table 1.
Table 1
Steel and rock parameters
Steel
quality
S 690 Tensile yield
strength σ0,2% =σF Minimal flexural
stress σb,min Young´s
Modulus Poisson´s
ratio
690N/mm² 770N/mm² 210000
N/mm² 0.3 [-]
Rock
parameter Young´s Modulus Deformation
Modulus VF*- Modul Specific
weight Poisson´s
ratio
8GPa 6.3GPa 27kN/m³ 0.27 [-]
5.3. CONSTRUCTION – EXPERIENCE
In summer 2014 conventional tunneling started simultaneously from four
starting points. The excavated cross section was horseshoe-shaped for all tunnels.
Each face was monitored with instrumentation. The drives generally ran according
to the geotechnical calculations made in advance and the geological predictions.
2101
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik