the width of the tunnel. This construction was built by using Geo New Austrian
Tunneling Method (NATM) in 1984. The cavern structure reinforcement used rocks
around the tunnel as the prior buffer, then it was shotcrete-lined and it was
reinforced by rock bolt and pre-stressed concrete. Since NATM was a method for
rational construction by using surrounding rocks as the buffer, so it was very
important to do monitoring towards the change of the rocks regularly and to keep
the safety and the reliability of the underground construction; the monitoring and
maintenance activity towards caverns wall were implemented.
The monitoring and maintenance system for the safety of Power House
Caverns structure of PLTA Cirata, which had been operated for 30 years, are
regularly implemented every month. The monitoring activity uses three
instruments, i.e. Rock Displacement Extensometer, Crack Displacement Meter,
and Convergenmeter. The instruments of Power House Caverns of PLTA Cirata
were installed when the cavern construction is being built.
2. MONITORING SYSTEM OF POWER HOUSE CAVERNS
The activity of regular maintenance and monitoring was done to know the
structural safety early; it had been mentioned in Ministerial Regulation of PUPR
Number 27/PRT/M/2015 as one of the requirements for the management of dam
and complementary construction. The Power House Caverns of PLTA Cirata had
some monitoring instruments such as Rock Displacement Extensometer, Crack
Displacement Meter, and Convergenmeter. The functions of each instrument of
PLTA Cirata Power House Caverns could be seen as follows:
Monitoring the instrumentation on the implementation of Power House
Caverns of PLTA Cirata has been being done continuously up till now. In geological
conditions, the Power House Caverns of PLTA Cirata was located between the
rock layers of volcanic breccias which could gradually be decomposed. Based on
the phenomenon, the maintenance and monitoring activities was done towards the
instruments related to the rocks which become the buffers of Cirata cavern. This is
the description about installed instruments and the monitoring result from Power
House Caverns of PLTA Cirata:
2.1. ROCK DISPLACEMENT EXTENSOMETER
The monitoring activity of rock mass which was located on the Power House
Caverns structure was done by using rock displacement extensometer
(Extensometer). This instrument was installed in rock bolt structure to monitor the
displacement of rock mass which was located on the roof of Power House Cavern.
The displacement of rock mass at Power House Caverns of PLTA Cirata was
measured by using censor which records the stress and strain happened on the
2107
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik