Page - 2137 - in Book of Full Papers - Symposium Hydro Engineering
Image of the Page - 2137 -
Text of the Page - 2137 -
along the downstream side of the dam and the water amount is measured at
seven V-weirs with ultrasonic sensors. Furthermore, the position of the dam is
recorded to estimate its stability. Therefore, four measuring sections are
equipped with a pendulum and an inverted pendulum. The pendulum measures
the inclination from the dam crest to the measuring location in the control gallery.
The inverted pendulum is anchored in the rock and provides information on the
relative movement of the dam with regard to the foundation. In addition, the water
level in the lake Mutt is recorded.
Fig. 8
Measuring box for the flotation measurements with digital displays of the current
heads
5. DATA ACQUISITION SYSTEM
An automatic data acquisition system was installed in the dam guard cabin
directly besides the lake Mutt dam. The power supply includes a UPS
(uninterruptable power supply). All described instruments are readout via a data
bus system. The communication of the DAS with the sensors is ensured by a
backbone system and multiple sub-bus systems. Therefore, most parts of the
measuring points would still be monitored also in the case when main
components of the system might be subject to failure. A total of about 250 sensor
channels is recorded which, in addition, are partly calculated into target units. All
data is integrated in the higher-level analysis system of the dam operator.
2137
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik