Page - 2138 - in Book of Full Papers - Symposium Hydro Engineering
Image of the Page - 2138 -
Text of the Page - 2138 -
REFERENCES
[1] BECKER H.J., HUBRIG M. STOLZ M., THUT A., WĂ–RSCHING H.
Instrumentierung und Monitoring in der Geotechnik. Grundbau-
Taschenbuch, Teil 1: Geotechnische Grundlagen, Witt, K.J. (ed.). 8.
Auflage - April 2017, pp 867-967. Ernst & Sohn Verlag, 2017.
[2] KECH M., NATEROP D., SENTI R. Hydrogeological and geotechnical in-
situ testing for large caverns. Rock Engineering in Difficult Ground
Conditions- Soft Rocks and Karst (Vrkljan I., ed.), London 2010.
[3] MĂśLLER U., MARCLAY R., DUNN J., HOHBERG J.-M., HASE M. The
Linth-Limmern hydro-power plant – Design and construction of a large
pumped storage scheme. Underground – the way to the future! (G.
Anagnostou G, & H. Ehrbar H., eds.), World Tunnel Congress 2013,
Geneva 2013.
[4] MARCLAY R., HOHBERG J.-M., JOHN M., MARCHER T., FELLNER D.
The new Linth-Limmern hydro-power plant – design of caverns und 500 m
overburden Rock Mechanics in Civil and Environmental Engineering (J.
Zhao et al. eds.), Proc. EUROCK 2010, pp. 467-470. CRC Press/Balkema
2010.
SUMMARY
The pumped storage power plant Limmern in the Swiss Alps was an
important hydropower project during the last years. To pump water from the lake
Limmern in the about 600 m higher lake Mutt and to increase the power
production up to 1,420 MW, a new underground machinery centre and a new
gravity dam for the lake Mutt were constructed. The design required
comprehensive investigations of rock parameters. Hydraulic tests were
performed to obtain information on the hydraulic conductivities and the static
formation pressures in the partly schistose and karstic Quinter limestone. The E-
and D-moduli of the rock were determined with dilatometer tests. Finally,
hydraulic fracturing tests were conducted to estimate the minimum primary
stresses in the rock. These investigations considerably helped to improve the
models of the underground and to adjust the design of the three caverns.
During the construction of the central machinery cavern, a complete data
set of the convergence behaviour was obtained from the anchor forces and the
extensometers, which were installed in cross-sections close to the advancing
excavation.
A further task was the long-term monitoring of the lake Mutt dam. 166
sensors were installed, including pressure sensors for flotation measurements
and lake level monitoring, sensors for temperature and seepage measurements
and pendulums. All sensors were connected with a redundant bus system to a
2138
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik