Page - 2151 - in Book of Full Papers - Symposium Hydro Engineering
Image of the Page - 2151 -
Text of the Page - 2151 -
After the installation and construction works has completed in January 2018
since construction works started in August 2016 (18 months), the system
of Lodagung SHPP performed well. The turbines and generators worked
with the pressure in penstock similar with turbines in range 0,83 – 1,03 bar
with output capacity of each turbine 407 – 643 kW.
4. Conclusion
a. The small scale hydropower is potential and promising to be built because
there is continuity of flow which using irrigation water allocation and
effective head is adequate
b. There is a need of additional electricity supply in the adjacent and
surrounding area
c. The construction of hydropower particularly water intake should not disturb
dam embankment and also keep reservoir performance for irrigation
supply.
d. Development of siphon intake model then become best solution, even
though needs precise hydraulic calculations.
e. Small scale hydroelectric power with siphon intake technology which may
be first been built in Indonesia finally come through in early of year 2018.
f. It becomes a challenge that siphon intake as hydro power water way or
water way for other purposes, could be implemented to other small dams
without disturbing existing dam embankment, in consideration with dam
safety.
5. References
[1] ATOMIC ENERGY RESEARCH CENTER - BATAN, Report of Seepage
Investigation at Wlingi Dam with Radioisotope Bapel of Kali Brantas
Versatile Master Project, 1 and 19, 1978.
[2] TECHNICAL CONSULTANT OF NIPPON KOEI Co., Ltd., Wlingi
Multipurpose Project Report on Ground Water In Limestone Foundation
and Dam Safety, Jakarta, 1980.
[3] JASA TIRTA I, Final Report of Capacity Design Review and Layout of
Lodagung MHP Project (2 x 0.65 MW) PT Wiratman Power Jakarta, 2015.
[4] VONNY CS, BAYU PKS, Lodagung SHPP Development In Using Hidro
Power Potential In The Wlingi Dam In Blitar, East Java Province, INACOLD
Jakarta, 2015.
2151
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik