Page - 2183 - in Book of Full Papers - Symposium Hydro Engineering
Image of the Page - 2183 -
Text of the Page - 2183 -
Rock mass classification systems developed by international society of rock
mechanics to achieve uniformity of rock mass description all around the world.
Rock mass classification is a basic communication between the geologists and
engineers [1]. The RMR and Q systems are two rock mass classifications most
commonly used in rock engineering, which values of each rock mass class
relating it to specific engineering problems [2]. These systems provide guidelines
for the selection of rock reinforcement for exposed area. The guidelines present
shotcrete and lattice girded/Steel Ribs for weak unstable rocks during tunnel
excavation [3].
In traditional tunneling methods, over-excavation due to geological
conditions and collapse of weak rock area is almost inevitable [4]. In these
situations, reinforcing methods should be used, in according to rock mass
classification systems, to prevent occurring and/or development of rock collapse
[5]. However, empty spaces remain behind the rock reinforcing systems.
Any gaps between tunnel ceiling and reinforcement system can cause
unpredictable deformations (such as collapse etc.) of the surrounding rock [6].
Therefore, such gaps should be filled with stiff and solid materials. Contact
grouting is a most common practice for backfilling of the gaps [7], [8]. In case of
collapsed area, empty spaces behind the reinforcing systems mainly could be
filled by desirable material for instance packed pumice pieces in, and then
injected by cement grout to get a solid portion between rock and lining [9].
2. DEFINATION OF THE PROBLEMS
The project is a hydroelectric power plant, including of about 4 Km water
transfer tunnel. The tunnel is excavated by the traditional method, using
excavation machines such as Jack Hammer, Rodheader and sometimes with
explosives. Type of the rock along this tunnel is a poorly-grade of metamorphic
rocks, often containing meta-sandstone, slate and phyllite, and in some cases
schist. During the tunnel excavation, problems such as rock collapse and over-
excavation due to the intersection of faults, major joints, crushed zones and
particularly wet areas are encountered; several times. If necessary, initial tunnel-
supporting systems consist of lattice girded/steel ribs; wire mesh and shotcrete
were installed at collapse and over-excavated areas during the excavation
phase. Two type of plastic sacks was used for placing of pumice pieces in gaps
behind reinforcing systems, as shown in figure 1, type A: flour sacks and type B:
onion sacks. After the completion of the tunnel excavation, the final concrete
lining was installed.
Now, there are three main questions?
First: is it possible to filling the porosity between sacks and inside pumice
pieces? On the other hand, which type of sacks is better to use that has cement
grout penetrability?
2183
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik