Page - 2217 - in Book of Full Papers - Symposium Hydro Engineering
Image of the Page - 2217 -
Text of the Page - 2217 -
Figure 1: Longitudinal section of a typical Alpine high head power plant
The key task of the headrace system is to transfer the turbine water from
intake to the power station with reasonable head losses and to bear the maximal
internal pressure. The goal is to gain as much support as possible from the
surrounding rock mass. Economically sealing and grouting of the pressure tunnel
will require sufficient overburden. This can be achieved by an optimized layout
design. A special benefit can be gained, if the ground water table is located
above the internal pressure of the tunnel. For those reasons, a typical Alpine high
head power plant tries to meet the following goals [1]:
- To subdivide the headrace system in a long low- pressure section and a
short high- pressure section.
- To gain the benefit from a ground water pressure above the maximal
internal pressure and to remain beyond the “Walch’ border” [1] as far as
possible.
- To place the surge system completely below the surface
This can be achieved if the layout (Fig. 2) is designed in a way that most of
the cross sections fulfill the conditions shown in Fig. 3.
2217
Book of Full Papers
Symposium Hydro Engineering
- Title
- Book of Full Papers
- Subtitle
- Symposium Hydro Engineering
- Author
- Gerald Zenz
- Publisher
- Verlag der Technischen Universität Graz
- Location
- Graz
- Date
- 2018
- Language
- English
- License
- CC BY-NC-ND 4.0
- ISBN
- 978-3-85125-620-8
- Size
- 20.9 x 29.6 cm
- Pages
- 2724
- Keywords
- Hydro, Engineering, Climate Changes
- Categories
- International
- Naturwissenschaften Physik
- Technik