Page - 22 - in Short-Term Load Forecasting by Artificial Intelligent Technologies
Image of the Page - 22 -
Text of the Page - 22 -
Energies2018,11, 2226
43. Li, M.W.; Geng, J.; Hong, W.C.; Chen, Z.Y. A novel approach based on the Gauss-vLS-SVR with a
newhybrid evolutionary algorithmand input vector decisionmethod for port throughput forecasting.
NeuralComput.Appl.2017,28, S621âS640. [CrossRef]
44. Li,M.W.;Hong,W.C.;Geng, J.;Wang, J.Berthandquaycranecoordinatedschedulingusingchaoscloud
particleswarmoptimizationalgorithm.NeuralComput.Appl. 2017,28, 3163â3182. [CrossRef]
45. Xiong, Y. Study on Short-TermMicro-Grid LoadForecastingBased on IGA-PSORBFNeuralNetwork.
MasterâsThesis,SouthChinaUniversityofTechnology,Guangzhou,China,2016.
46. Hong,T.; Pinson,P.; Fan, S.; Zareipour,H.; Troccoli,A.;Hyndman,R.J. Probabilistic energy forecasting:
GlobalEnergyForecastingCompetition2014andbeyond. Int. J.Forecast. 2016,32, 896â913. [CrossRef]
47. Hong, W.C. Application of seasonal SVR with chaotic immune algorithm in trafïŹc ïŹow forecasting.
NeuralComput.Appl.2012,21, 583â593. [CrossRef]
48. Diebold,F.X.;Mariano,R.S.Comparingpredictiveaccuracy. J.Bus. Econ. Stat. 1995,13, 134â144.
49. Derrac, J.;GarcĂa,S.;Molina,D.;Herrera,F.Apractical tutorialontheuseofnonparametric statistical tests
as amethodology for comparingevolutionaryandswarmintelligencealgorithms. SwarmEvol. Comput.
2011,1, 3â18. [CrossRef]
50. Wilcoxon,F. Individualcomparisonsbyrankingmethods.Biom.Bull. 1945,1, 80â83. [CrossRef]
©2018bytheauthors. LicenseeMDPI,Basel,Switzerland. Thisarticle isanopenaccess
articledistributedunder the termsandconditionsof theCreativeCommonsAttribution
(CCBY) license (http://creativecommons.org/licenses/by/4.0/).
22
Short-Term Load Forecasting by Artificial Intelligent Technologies
- Title
- Short-Term Load Forecasting by Artificial Intelligent Technologies
- Authors
- Wei-Chiang Hong
- Ming-Wei Li
- Guo-Feng Fan
- Editor
- MDPI
- Location
- Basel
- Date
- 2019
- Language
- English
- License
- CC BY 4.0
- ISBN
- 978-3-03897-583-0
- Size
- 17.0 x 24.4 cm
- Pages
- 448
- Keywords
- Scheduling Problems in Logistics, Transport, Timetabling, Sports, Healthcare, Engineering, Energy Management
- Category
- Informatik